Evaluation: Reports

report EN

The report generated with input data and results can be found under Reports. It is possible to specify headings to be included in the report from Print options and to print / save the report as PDF. In addition, it is possible to study the results in detail.
The user can also export the report to text, so that it can be imported into excel.

There are possibilities to add to your report content, by pressing on +add report content.
Select the indicator to be used and enter a name on the graph being created. Select Timeline to create a graph showing how the indicator varies over the year with the possibility to choose the time resolution of the values (monthly, weekly, daily, or hourly values). Clicking OK adds the graph to the report.

Why wait? Get an automatic Free Trial or book an instant Live Demo of BIM Energy
and Get Started today!